"Very Comfortable"
Donna, Eli’s wife, was awesome. She is an interior designer and helped us with the selection process when ordering the flooring, tiles for the shower and the bathtub, wall color, cabinet color selection, all the bath accessories (tub, toilet, glass s
- Judy F.