Kitchen Remodeling Los Angeles, CA

Looking to get kitchen remodeling done in LA? Look no further than Eli and Donna, the team who treat every job like a passion project. We have worked extensively with dozens of general contractors throughout Los Angeles on some of the most exclusive homes in the area – take a look our work over in our kitchen remodeling gallery.

Call us at (888) 368-1666 or fill out the form and we will call you back.

Contractors License: #990316

The General Contractors Behind Some of the Most Beautiful Homes in the Los Angeles Area

Eli-and-Donna-720w.jpg
Your kitchen is the heart and soul of your home. It is also usually the busiest room in your home. Apart from being a room where all the food is prepared, it’s also a sanctuary where you can chat with your friends and family over a cup of tea or coffee. We all have childhood memories of spending time in the kitchen with our family that will stay with us forever.

That’s why our team focuses on both aesthetics and functionality with every kitchen remodeling project we undertake. It needs to be open and inviting for anybody that enters your home. Whether you want a renovation of your existing build or are looking for a brand new construction from scratch, Quality First Builders is a name you might have heard here in LA!

Our Kitchen Remodeling Services Are Personalized

We approach every kitchen remodeling project with the people behind them in mind. We get to know you and your family’s needs to ensure the project checks every box you were hoping for. Before construction even begins, our general contractors will come around to provide a completely free consultation. We’ll walk you through the process, talk interior design, help you flesh out your ideas, and help you understand the scope of your budget.

We’re not just another soulless construction company – we’re in the business of building homes that feel modern but inspired, tailored to who you are. Once building commences, our contractors are extremely professional and conscious of your family’s need to get their living space back as quickly as possible. We minimise disruption to the surrounding area as much as possible and perform every home remodeling job in the most efficient manner – saving you time and frustration.

Kitchen Remodeling Project in Culver City

Don’t just take it from us! Here you can view our recent kitchen remodeling project for homeowners in Culver City. See pictures of our work and listen to them share their experience of working with our contractors from planning to installation.

"When I come in here I feel like I'm walking in a brand new house"

Our Kitchen Remodeling Photo Gallery

Take a look at some of our previous kitchen renovation projects. If you like what you’re seeing and you live in Los Angeles CA, then give us a call or fill out the form below. We’ll call you soon to discuss bringing your own kitchen renovation ideas to life.

“Eli completely remodeled my kitchen, master bedroom and master bathroom. He did a fantastic job and was able to handle all of the challenges of remodeling a 1920’s spanish style home. His crew was professional and timely. A+++ will def use again for future projects.”

– Nicholas Tocco

“I needed to find someone to remodel my kitchen and living room. I was already interested in Quality First because their website showed impressive work (look at their before and afters!) and when I met up Eli, the owner, he told me everything I needed to hear. They did an amazing job. They were timely, efficient, and you definitely get what you pay for.”

– Tiffany Tran

"Eli and his team are easy to communicate with, trustworthy and very fast! They did an amazing job remodeling our kitchen and wet bar. Will use them again for our bathroom!"

- James P.

Why Remodel the Kitchen?

It’s common knowledge in the real estate industry that a kitchen remodel is one of the few projects that can actually add a profit margin to a home sale. The kitchen is notably the most valuable room in the house. When someone comes to view your home for the first time they always gravitate towards the kitchen. We’ve been in the business long enough to vouch that if the kitchen wows them, they are usually sold on the house before they step foot in any other room.

A new kitchen construction is also a great opportunity to go green with the installation of energy efficient upgrades and appliances that will cut down on your future expenses into the long-term and drastically reduce your carbon footprint.

Many of our clients have also told us that their primary motivation for getting a custom kitchen remodel is to revisit the “lay of the land” and make the space function for them and their family’s unique needs. Looking to knock down a wall for that open floor plan, or reallocate space for that large island you can bake to your heart’s content at? Now’s your chance!
qfb-kitchen-remodeling-projects-10

How Much Does it Cost to Remodel a Kitchen in the Los Angeles Area?

Typically, the cost of Los Angeles kitchen remodeling will differ depending on the size of the room, the extent of the changes and of course the costs of brand new furnishings, fixtures and appliances that will need to be accounted for. Because every kitchen remodel is unique, we provide completely free on-site quotes tailored to the costs of your project! Just book a free consult using the form, or give us a call.
qfb-kitchen-remodeling-11

Kitchen Design Layouts

These days, large, open kitchens are in. A large island with a breakfast bar that faces the living room provides ample space for family gatherings and the day-to-day life that happens in the kitchen. Donna, our in-house designer project manager, has a trained eye and years of experience to help maximize your kitchen space. She will help you find the optimal layout for your home and your priorities. Our remodeling company can add, remove, or move walls as needed to facilitate your dream build. We’ll help you find the optimal spacing and locations of your appliances tailored to your family’s needs and budget.
qfb-kitchen-remodeling-23

Choosing the Right Countertops for Your Kitchen Remodel

The go-to material used in countertops in the modern-day and age is definitely granite. It’s hard to beat that totally unique and interesting look that rock from deep in the earth can provide. That said, granite is not the only option. There are many options for countertops these days from butcher block to manufactured stone, and even concrete if you’re going for that industrial look. The combination of your countertop and your backsplash will make every second spent cooking in your new kitchen an absolute delight. What kind of kitchen contractor would we be if we didn’t know the countertop suppliers in Los Angeles well – our team will help you find the perfect kitchen counter surface for your cooking experience as well as the visual appeal to match your interior walls, tile choices, appliances, lighting and of course…budget.
Kitchen-Remodeling-8-720w.jpg

Storage and Utility Options

Cabinets are the centerpiece of kitchen remodels. The design features and color of the cabinets will determine how the rest of the room goes together. Our designs blend the functionality that high-end cabinets provide to the users of a kitchen as well as that look that makes people go “Wow!” when they enter the room.
qfb-remodeling-46

Flooring That is Beautiful and Durable

Options for flooring materials are pretty much endless, and it’s easy for homeowners to be overwhelmed by the sheer magnitude of options that may appear fairly similar at first glance. However, there is a lot to factor when choosing kitchen flooring. For the kitchen, especially, durability and water resistance are just as important as the visual appeal.

Our designer, Donna, will work closely with you to figure out the look and feel you are going for and then select options for flooring that will achieve those goals. Some of the most common materials we like to use for flooring are:

  • Marble tiles
  • Porcelain tiles
  • Hardwood flooring
  • Vinyl plank

Appliances to Fit Your Style

Appliances can make or break the functionality of your kitchen and determine how enjoyable it is to use your kitchen. There’s no shortage of ideas and our contractors have done it all. Farm sinks provide a large area for washing dishes or rinsing off vegetables. Large refrigerators provide plenty of space to keep your cold food well organized and accessible. And, of course, your range is where the magic happens so it has to be top-of-the-line. Energy efficient upgrades are also becoming a priority of Los Angeles residents, which only makes sense. This will have an impact on the household budget well into the long-term.

Our contractors are very familiar with all of the major brands and will help you find the appliances that will last. Our relationships with local distributors throughout Los Angeles CA make sure we get exactly what we’re looking for every time.

Shining Light On It All

Lighting is an afterthought for some kitchen remodelers, but to our team, it’s one of the most important aspects of your kitchen design. Pendant lights accent your island and make the most beautiful features of your kitchen stand out to the eye. Recessed ceiling lights provide the working light needed without getting in the way or drawing attention away from the finer parts of the room.

The lighting on all our kitchen remodels has always been a standout point of the end result – and is something no contractor should overlook. Take a look at our gallery to see what we mean – we’ve had the privilege to complete some truly spectacular kitchen remodels across Los Angeles, including Beverly Hills and Santa Monica.

Let's Talk About Your Vision

No one knows your home like you do. Perhaps you’re motivated by the idea of a room addition to your kitchen for combined entertaining? Maybe you feel your small kitchen could do with some expanding? Maybe the countertops are dark and dreary, or maybe the last renovation wasn’t such high quality work. Whatever your reason, why not get in touch with our team of kitchen remodeling contractors in Los Angeles for a free consult to discover what’s involved in making your kitchen design dreams a reality.

Our Kitchen Remodeling Process From Start to Finish

Design, Blueprints, Engineering, and Permits

Every kitchen remodeling project starts with a dream. You close your eyes and see yourself cooking in a kitchen that only exists in your mind. Everything from the cabinets to the countertops are perfect, just the way you want them. It’s not a clear vision, but the feeling is there. You know exactly what you want and you’re trying to figure out what it looks like. It’s the job of Donna, our all-star designer, to help you visualize the possibilities.

With Donna’s working design, Eli, our general contractor who has overseen many a Los Angeles kitchen, will work with architects and engineers to get the plans approved by the city in order to acquire the necessary permits and get the green light to complete the project. Once we have the green light, we put you on the schedule to begin construction. After that, from your end, focus shifts to the fun side of home remodeling. Think interior walls, new flooring, new cabinets, and new countertops and leave the logistics to our kitchen remodelers.
Kitchen-Remodeling-7-1280w.jpg
qfb-remodeling-45

Layouts and Moving Walls

Oftentimes we will completely change the look and feel of a kitchen by moving or removing walls. The age of open concepts is upon us and a lot of us like the feeling we get when we have room to breathe while we’re cooking and conducting the business of our household. This can also have a hugely positive impact on a small kitchen.

Electrical & Plumbing

Almost always, we need to move electrical and plumbing fixtures to accommodate the new design layout. Our master plumbing company options are ready to go when it comes time to move the technical parts of the project. It’s worth getting these services done right, so you only have to do them once! It took us a while to source the kind of contractor we found to be reliable bets, so you can rest assured your next project is in competent hands.

Applying the Color to Walls and Ceilings

The colors of materials that go into your new kitchen will make or break the design. That’s why we rely on the keen eyes of our company design-lead Donna to make sure everything flows and provides the desired effect and feel we’re going for. The walls will often be painted early in the renovation process before the cabinets go up. Touch-ups will be done later in the project as necessary.

Installing Cabinets

The cabinets will be delivered in carefully packaged boxes. Our carpenters will make it their business to check through each box to make sure the cabinets are the correct shapes and sizes and also make sure they’re not damaged. When it’s time for installation, you’ll be amazed at how fast it goes. One minute your walls are bare. A few hours into construction, your kitchen has been transformed.
qfb-kitchen-remodeling
Kitchen-Remodeling-21-720w.jpg
Kitchen-Remodeling-17-720w.jpg
Kitchen-Remodeling-1280w.jpg

Countertops and Backsplashes

Once the cabinets are installed, the countertops company will send a technician to take a careful laser-guided measurement. He’ll take that measurement back to the factory to cut the stone in the exact shapes and sizes that will fit your home. Once they come back and secure the countertops in place, the tile installer will install your backsplash. This is where things really start to come together for all kitchen and bathroom projects. The impact of the right countertops with the right lighting really is second to none.

Flooring Installation

Flooring doesn’t only need to look great, but it needs to hold up to the abuse it’s surely going to receive from your day-to-day life. Dropping things, dogs running around, and spilling liquids are only a few of the challenges your floor must be facing so we’ll take special care when choosing the materials and construction methods for this part of your kitchen. The flooring may go in earlier in the home remodeling process and be covered to protect it from dropped tools and paint.

Trimming out Windows, Doors, Ceilings, and More

Every Los Angeles kitchen deserves the right amount of trim. The trim is what frames your floors, ceilings, windows, and doors. It’s what adds a depth of field to your walls and makes you take notice when you walk into a different room. The type of trim that goes into your kitchen will depend on the other major design features of the project. Our kitchen remodeling contractors will help you pick something standout.

Lighting and Punch Lists

Finally, lighting is what makes the magic happen. A proper lighting installation accents the amazing features of your new kitchen while shining light, literally, on your day-to-day activities. Again, Donna’s eye for design when it comes to lighting puts the finishing touches on every kitchen remodel project we complete. When we can see what we’re working on, we’ll complete the punch list of small details that seal the deal.
qfb-remodeling-47
But we don’t expect you to take it from us.

See What Our Clients Say About Their Kitchen Remodeling

SANTA MONICA, CA

Kitchen Remodeling

NORTHRIDGE, CA

Complete Kitchen Remodeling

NORTH HOLLYWOOD, CA

Kitchen Remodel Including Pantry/Laundry Room

General Contractors Los Angeles: Reach Out To Us

Call or fill out the form below and we will be calling you as soon as we can to talk about your project.

Contact Information

Working Hours

Your Address*

Get in Touch

Reach out to us, describe what you are trying to create and we will provide a detailed explanation of how we can make your dream come true!